Singapore · PUB submissions

Sanitary & plumbing drawings, prepared right for PUB

We prepare sanitary plumbing, drainage and water service drawings to PUB's Codes of Practice, ready for your Qualified Person or Licensed Plumber to submit. Clear, carefully checked drawings help keep PUB comments and resubmissions to a minimum.

WhatsApp +65 8151 8857 is for text messages only. For calls, please use our office line.

SANITARY LAYOUT · DISCHARGE PIPE → IC
  • Drawn to PUB Code of Practice on Sewerage & Sanitary Works (3rd Ed., Mar 2025)
  • Water service schematics to SS 636
  • Formatted for CORENET / PUB B&P Portal submission

Our drawing services

Drawings for every stage of a PUB sanitary, sewerage and water service submission, from first clearance to completion.

Sanitary plumbing & drainage layouts

Floor-by-floor layouts showing sanitary appliances, floor traps, discharge pipes and stacks, ventilation, inspection chambers and the connection to the public sewer, prepared to PUB's Code of Practice on Sewerage and Sanitary Works.

Water service installation (WSI) drawings

The site plan with the proposed water meter location and the water reticulation schematic that a Licensed Plumber or Professional Engineer submits to notify PUB before WSI works start, drawn to SS 636.

DC & DP clearance drawings

Drawings to support your QP's Development Control (DC) and Detailed Plan (DP) submissions for works affecting sanitary, sewer and used water pumping systems.

As-built drawings for TOP / CSC

Completion drawings reflecting what was actually built, to support your QP's application for PUB sewerage and sanitary clearance for TOP and CSC.

A&A and renovation re-layouts

Updated sanitary layouts when toilets, kitchens or wet areas are added, moved or converted, including food premises where the Code requires a grease trap.

Amendments to PUB comments

Quick revisions when PUB raises comments or asks for clarification, so your submission can be resubmitted without long delays.

Please note: we prepare drawings. Under PUB's rules, sanitary plans for new developments and building works are submitted by a Qualified Person (a registered Architect or Professional Engineer), and regulated water service and sanitary works are carried out by PUB Licensed Plumbers.

How it works

  1. 1

    Send us your project

    WhatsApp or email your architectural plans, site address, the scope of works and who your QP or Licensed Plumber is.

  2. 2

    Scope & quotation

    We confirm which drawings the submission needs and send you a clear, itemised quotation.

  3. 3

    We draft the drawings

    Layouts and schematics are drawn to the current PUB Codes of Practice and SS 636, then checked before issue.

  4. 4

    QP / LP review & submission

    Your QP or Licensed Plumber reviews, endorses and submits through CORENET or PUB's Business & Professional Portal.

  5. 5

    Amendments & completion

    We handle revisions to PUB comments and prepare as-built drawings for TOP and CSC clearance.

Who we serve

  • Qualified Persons: Architects and Professional Engineers who need sanitary drawings for PUB submissions.
  • Licensed Plumbers who need WSI site plans and schematics.
  • M&E consultants, builders and contractors who want drawings off their plate.
  • Interior designers and renovation contractors moving toilets, kitchens or wet areas.
  • Developers and building owners who want a dependable drawing partner.

Project types

  • New buildings
  • Addition & alteration (A&A)
  • Landed homes
  • Condominiums
  • HDB-related works
  • Commercial & office
  • F&B and food shops
  • Industrial & factories

Frequently asked questions

Who submits sanitary plans to PUB?

For new developments and building works, the developer or building owner must engage a Qualified Person (QP), either a registered Architect or a Professional Engineer with a practising certificate, to prepare and submit plans for the sewerage and sanitary works. The QP is also responsible for making sure the works are built according to the approved plans.

When do I need a Licensed Plumber, and when a Professional Engineer?

Water service installation works must be carried out by a PUB Licensed Plumber, who can also do the design when no pumping equipment or water tank is involved. If the installation involves pumping equipment or a water tank, a Professional Engineer must be engaged to design it and supervise the works.

What are the stages of PUB clearance for a building project?

Before sewerage, sanitary and drainage works start, the QP obtains Development Control (DC) clearance and then Detailed Plan (DP) clearance. After the works are completed, the QP applies for PUB clearance for the Temporary Occupation Permit (TOP) and then the Certificate of Statutory Completion (CSC). Simple projects that meet PUB's criteria may use a Simplified Submission instead of a DC submission.

Which codes do sanitary and plumbing drawings have to follow?

Sanitary and sewerage works follow PUB's Code of Practice on Sewerage and Sanitary Works (3rd Edition, March 2025), whose new requirements took effect on 1 September 2025. Water service installations follow the Public Utilities (Water Supply) Regulations and Singapore Standard SS 636, the Code of Practice for Water Services.

What drawings are needed to notify PUB of water service works?

Before work starts, the Licensed Plumber or Professional Engineer notifies PUB with a site plan showing the proposed water meter location and a schematic drawing of the water reticulation system. When the works are done, they submit a Certificate of Satisfactory Completion.

Does PUB charge a fee for Licensed Plumber submissions?

PUB states that it does not impose administrative or processing fees for these regulatory submissions. Any fee charged for preparing a submission is a commercial charge set by the service provider, so ask for an itemised quotation.

Do you submit the drawings to PUB for me?

We prepare the drawings. Submissions to PUB are made by the project's Qualified Person or Licensed Plumber through CORENET or PUB's Business & Professional Portal, as PUB requires. Tell us who your QP or Licensed Plumber is and we will prepare the drawings in the format they need.

Based on PUB's published guidance, checked October 2026. Always confirm current requirements with PUB or your QP.

Get a quote for your drawings

Send us your plans and scope. We'll tell you what PUB drawings you need and what it will cost.

This opens your email app with the details filled in. Nothing is stored on this website. Please attach your plans to the email.